Wednesday, July 22, 2009

Retaining wall

Aaron pictured doing a fantastic job setting the first course of a
retaining wall. The first course is the toughest with these blocks, it
has to be perfect. Fortunately he is being assisted by Spartacus the
cat.

Friday, July 17, 2009

Concrete curbs

We cut out the asphalt, formed, and poured this concrete sidewalk and
curb in one day. It was a lot of work but looking back at this
concrete sidewalk and concrete curb, it was worth it. We are proud to
say we poured this concrete sidewalk and curb.

Thursday, July 16, 2009

Atlanta Motor Speedway.

This is a finished concrete patio, sidewalk we did for AMS. Soon it
should be a new party area. It was placed in two pours and the logo
was saw cut then stained. Looks great.

Wednesday, July 15, 2009

We do footings

Footings, footings, and more footings, while Stephen was eating some
pudding(s).